A 450t buoy has been delivered to the port of Invergordon in Scotland, the biggest single lift ever undertaken at the Port. The 450t offshore loading buoy, will be undergoing minor modifications at the port, before being towed out to UK sector of the North Sea later in the year. The buoy arrived on the MV Paula, and was offloaded using the vessel’s paired 320t onboard cranes. It was lifted onto a self propelled modular tranporter, provided by Abnormal Load Engineering. The special projects division of Port Services (Invergordon) Limited handled the logistics of the manoeuvre. Operations director Steve Clark said: "This marks the start of an extremely exciting time for Port Services Limited in Invergordon and Aberdeen, where we have been successful in securing several major logistics contracts." |
友情提醒 |
本信息真實(shí)性未經(jīng)中國工程機(jī)械信息網(wǎng)證實(shí),僅供您參考。未經(jīng)許可,請(qǐng)勿轉(zhuǎn)載。已經(jīng)本網(wǎng)授權(quán)使用的,應(yīng)在授權(quán)范圍內(nèi)使用,并注明“來源:中國工程機(jī)械信息網(wǎng)”。 |
特別注意 |
本網(wǎng)部分文章轉(zhuǎn)載自其它媒體,轉(zhuǎn)載目的在于傳遞更多行業(yè)信息,并不代表本網(wǎng)贊同其觀點(diǎn)和對(duì)其真實(shí)性負(fù)責(zé)。在本網(wǎng)論壇上發(fā)表言論者,文責(zé)自負(fù),本網(wǎng)有權(quán)在網(wǎng)站內(nèi)轉(zhuǎn)載或引用,論壇的言論不代表本網(wǎng)觀點(diǎn)。本網(wǎng)所提供的信息,如需使用,請(qǐng)與原作者聯(lián)系,版權(quán)歸原作者所有。如果涉及版權(quán)需要同本網(wǎng)聯(lián)系的,請(qǐng)?jiān)?5日內(nèi)進(jìn)行。 |